Solar Power Subsidy in Gujarat, How to get it after 30.09.23? Latest

SOLAR POWER SUBSIDY IN GUJARAT

SOLAR POWER SUBSIDY

Government of Gujarat appreciate the use of renewable energy like Solar. Both central as well as state government pass on the subsidy benefit (Capital Finance Assistance) to all the residential units in the state install the Solar rooftop during the policy duration decided by Government.

SOLAR POWER SUBSIDY IN GUJARAT

All the resident of Gujarat who install solar roof top during the policy period are benefited up to 40% of the capital subsidy of investment amount. However calculation of Investment amount is already instructed by Government.

Your investment value is : Lower of the 1 or 2

  1. Maximum cost as decided by MGVCL1
  2. Maximum Bench mark cost as decided MNRE2
However every resident only eligible for either State or Central subsidy benefit.

SOLAR POWER SUBSIDY CALCULATOR

For Gujarat following are the parameter to calculate the subsidy amount:

Total Installed Capacity of Solar rooftop SystemState / Central Govt. Capital Subsidy (%)
Up to 3kw/Hour40 % of Installation Cost
3 to 10 Kw/Hour40% for first 3 Kw
20% of Above 3 Kw , up to 10 Kw
Above 10 kw/Hour40% for first 3 Kw
20% of Above 3 Kw , up to 10 Kw
10% of Above 10 Kw.
Following Details required for Calculation of Subsidy amount for Gujarat State:
1. Consumer Tariff : RGPU or RGPR (Check Bill to find this data)
2. Type of Beneficial : Individual or Common
3. Required/Registered PV Capacity (in KW)
4. Existing PV Capacity (in KW)

You can also visit official Calculator via this link :- Calculate you Subsidy (For Gujarat)

You can also visit official Calculator via this link :- Calculate you Subsidy (For All States in India)

For common usage property installation like Club House, Swimming Pool, Gym, Garden etc. are connected by Housing societies than subsidy is granted up to 500 Kw/Hour. However Per resident member limit is 10 Kw/Hour per Member. It means If society has 30 member only than maximum load granted for calculation of subsidy is 30 Member * 10 Kw = 300 Kw/ Hour.

SOLAR POWER SUBSIDY IN GUJARAT 2023
Note: Subsidy is paid lesser of Solar Penal AC capacity or Inverter DC Capacity

SOLAR POWER SUBSIDY FOR INDUSTRIES

No Subsidy is Provided in the State of Gujarat if Premise is build for Residence. However Business users are allowed to getting 40% Depreciation benefit against book profit and pay less Income tax.

SOLAR POWER SUBSIDY ON ENHANCEMENT OF CAPACITY

Earlier you install Solar power roof top and your installed capacity is below 10Kw/hour than you are eligible for Solar Power Subsidy.

Ratio are the same as applied in New Installation.

For additional load up to 3Kw/hour rate of subsidy is 40%
If existing load capacity is below 10Kw/hours and after installing new roof top it’s more than 3kw/hour but less than 10Kw/hour than Subsidy on Load above 3Kw/hour is 20%
If Load Capacity exceeds 10Kw/hour than NO Subsidy on Above 10 Kw/hour 0%

PAYMENT CONDITION FOR SOLAR POWER SUBSIDY

Excess unit generated by You is credited in your account and net payment after adjusting your billing will be paid annually at the end of every financial year.

LIST OF EMPANLLED AGNECY FOR INSTALLATION

All the reginal DISCOM like UGVCL, MGVCL, TORRENT POWER upload list of approved agency on their website and also place details at their reginal offices. You can also choose form this link : Approved Installer List

HOW TO GET SOLAR POWER SUBSIDY AFTER 30.09.23

Agencies are spreading news that SURYA GUJARAT SCHEME will be closed after 30.09.2023. However it is wrong. SURYA GUJARAT SCHEME has operational period till 31.03.2025.

For easy of completion of work before 31.03.2025 all the new request must be register for subsidy on or before 30.09.2023

Most Important is only state government subsidy scheme get closed for new application but center still provide the subsidy to all the Indians residents.

Our Hon’ble PM launched new portal on 30.07.2022, Central Government Solar Rooftop Subsidy Programme .

One who miss this deadline still has the same benefit of 40% subsidy by applying on this portal. www.solarrooftop.gov.in Subsidy will be directly deposited on consumer’s Bank Account.

After 30.09.2023, You must apply to center for 40% Subsidy. 

SOLAR POWER SUBSIDY FOR AGRICULTURE IN GUJARAT

AGRICULTURE SUBSIDY

Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan Scheme (PM-KUSUM)

Gujarat State Level Solar Energy Data Management Platform 2023 in Gujarat : Apply Online (PM- KUSUM PORTAL)

Individual farmers/ group of farmers/ cooperatives/panchayats/ Farmer Producer Organizations (FPO)/Water User associations (WUA). Land on which the project is proposed to be installed should be within 5 km from the nearest electricity sub-station.

PM-KUSUM Scheme supports three different kind of installations, known as three components of the Scheme as given below:

news and updtaes
Follow us on YouTube. @taxbabu
  1. Component-A: Setting up of decentralized ground/ stilt mounted grid connected solar or other renewable energy based power plants up to 2 MW capacity
  2. Component-B: Installation of stand-alone solar agriculture pumps of capacity up to 7.5 HP
  3. Component-C: Solarisation of existing grid connected agriculture pumps of capacity up to 7.5 HP

For all states except for North-eastern States, Hill States/UTs and Island UTs, subsidy of 30%, each by Central and State Governments will be provided, and the remaining 40% will be invested by the farmer for installation of solar pump.

Subsidy in percentage mentioned above is applicable on benchmark cost or tender cost, whichever is lower.

For North-eastern States, Himachal Pradesh, Uttarakhand, Jammu and Kashmir/Ladakh and Island UTs, subsidy of 50% will be provided by Central Government and at least 30% will be provided by the State Government for installation of solar pump. Farmer will have to invest balance 20%.

For more details and informative Video : @taxbabu on Youtube.

  1. MGVCL: Madhya Gujarat Vij- Company ↩︎
  2. MNRE: Ministry of New and Renewable Energy ↩︎